1.10.2011

the list

The kitchen is still not complete, but we're definitely getting closer. All the countertops are poured, now we just need to do the finish work of polishing, sanding, covering the holes and sealing. On top of that we have more finishing work in the kitchen. Want to see the list? Here goes:
1. Attach kick plates and side panels to cabinets (same high gloss grey)
2. Attach all door handles
3. Connect range to gas and electric
4. Install garbage disposal and dishwasher
5. Finish sink installation and install faucet

Plus the finishing, FINISHING work:
1. Short tile backsplash
2. Open shelving between the 2 windows

Since we're at the end of a mile-long list, none of this seems entirely dreadful.

And PS the microwave is basically our kitchen at the moment. It won't be staying on the counter, we are going to try keeping it tucked away out of site.